Online Exporter Crawler Crane Daily Inspection Checklist - RC-WJ01 Safe Load Indicator for Excavator – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We normally think and practice corresponding towards the change of circumstance, and grow up. We aim at the achievement of a richer mind and body plus the living for Mobile Crane Hire Malta , Mobile Crane Hire East London , Mobile Crane Noise Levels , With a wide range, good quality, reasonable prices and stylish designs,Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
Online Exporter Crawler Crane Daily Inspection Checklist - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:

Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.

Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.

Parameter

working voltage DC 9v-36V
working temperature -20°℃-+70°C;
storage temperature -20°℃-+70°C;
system error ≤±10%;
display error ≤±10%;
relay contact capacity AC220V 3A;
protection grade IP65(other level of protection required customized)

Excavator Installation

 

Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Wj

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.

 


Product detail pictures:

Online Exporter Crawler Crane Daily Inspection Checklist - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures

Online Exporter Crawler Crane Daily Inspection Checklist - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures


Related Product Guide:

We now have many fantastic staff members customers superior at advertising, QC, and working with varieties of troublesome problem within the generation system for Online Exporter Crawler Crane Daily Inspection Checklist - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: Croatia, Czech republic, Paraguay, To keep the leading position in our industry, we never stop challenging the limitation in all aspects to create the ideal products. In his way, We can enrich our life style and promote a better living environment for the global community.
  • This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Cora from Myanmar - 2017.03.28 16:34
    The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By David Eagleson from Miami - 2017.01.28 19:59
    Write your message here and send it to us