Factory supplied Load Moment - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen Detail:

Highlight
1.Visible 10 inch LCD touch screen display, show the most comprehensive working states of tower crane in operation.
2.Friendly man-machine interface; automatically generated the coordinates of Tower crane & Obstacle, and Tower crane off-line protection (Optional)
3.Strict high and low temperature test, anti-fouling and anti-corrosion.
4.Higher integration greater precision data acquisition.
5.Stable, convenient, long service life of system;
6.Video manual, Easy for installation and calibration;
| Working temperature | -20℃ ~ 60℃ |
| Working humidity | ≤95%(25℃) |
| Power voltage | AC220V±25% |
| Working mode | continuous |
| Overall error | ≤±5% |
| Repeatability error of load cell | ≤±0.3% |
| Non-linear error of load cell | ≤±3% |
Function
Anti-collision
● Real-time monitoring Tower crane working conditions prevent collision risk of each parts, ensure the stop within functional distance setting.
● Up to 30 Tower cranes management by radio.
● Automatically generated the coordinates of Tower crane.
● Tower crane off-line protection (Optional)
The system operates in real time calculation of the distances between each crane parts and movement speed as well.
System will asthmatically control the equipped mechanism to completely stop the crane at a preset distance from certain obstacles
Zone protection
● Minimum 3 points from one obstacle to indicate a protection zone.
● Set and select activate/deactivate zones the override unit.
● Automatically generate obstacle coordinates
● Up to 10 zone around a tower crane
● Independent function distance setting

Data record
● Various data of Tower crane working status can be record constantly.
● Able to generate as EXCEL file and download to USB drive
● Online supervisor is available by add-on GRPS module.

In order to facilitate on-site construction management,the system supports working record, real-time record, anti-collision record, operation record browsing, data record,besides local browsing it supports USB download, and can be viewed on the computer as worksheet
| Real-time Record | Every 5 sec continuous recording |
| Working Record | Record data per every lifting. |
| Anti-collision Record | Record every control of prevent collision. |
| Operating Record | Record the setting of Tower crane parameter. |

Product detail pictures:
Related Product Guide:
Our pursuit and corporation aim should be to "Always satisfy our consumer requirements". We carry on to build and style and design remarkable quality items for both our outdated and new clients and reach a win-win prospect for our clients at the same time as us for Factory supplied Load Moment - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen , The product will supply to all over the world, such as: Burundi, Greece, Morocco, What is good price? We provide customers with factory price. In the premise of good quality, efficiency will have to be paid attention to and maintain appropriate low and healthy profits. What is a fast delivery? We make the delivery according to customers' requirements. Although delivery time depends on the order quantity and the complexity of it, we still try to supply products and solutions in time. Sincerely hope we could have long term business relationship.
We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!



