Factory Outlets Crawler Crane Boom Parts - RC-WJ01 Safe Load Indicator for Excavator – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our advantages are lower prices,dynamic sales team,specialized QC,strong factories,high quality products and services for Tower Crane Safety Standards , Tower Crane Hook Camera , Mobile Crane Ground Conditions , We never stop improving our technique and quality to keep up with the development trend of this industry and meet your satisfaction well. If you are interested in our products, please contact us freely.
Factory Outlets Crawler Crane Boom Parts - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:

Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.

Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.

Parameter

working voltage DC 9v-36V
working temperature -20°℃-+70°C;
storage temperature -20°℃-+70°C;
system error ≤±10%;
display error ≤±10%;
relay contact capacity AC220V 3A;
protection grade IP65(other level of protection required customized)

Excavator Installation

 

Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Wj

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.

 


Product detail pictures:

Factory Outlets Crawler Crane Boom Parts - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures

Factory Outlets Crawler Crane Boom Parts - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures


Related Product Guide:

We are convinced that with joint endeavours, the small business between us will bring us mutual benefits. We could assure you products quality and competitive selling price for Factory Outlets Crawler Crane Boom Parts - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: Romania, Stuttgart, Cyprus, Our factory insists on the principle of "Quality First, Sustainable Development", and takes "Honest Business, Mutual Benefits" as our developable goal. All members sincerely thanks for all old and new customers' support. We will keep working hard and offering you the highest-quality products and service.Thanks.
  • Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Denise from Bahrain - 2018.06.19 10:42
    This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
    5 Stars By Martin Tesch from Albania - 2018.12.30 10:21
    Write your message here and send it to us