Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We know that we only thrive if we could guarantee our combined price tag competiveness and quality advantageous at the same time for Mobile Crane Services , Mobile Crane Sales , Mobile Crane Hire Jobs , Now we have established steady and long business relationships with customers from North America, Western Europe, Africa, South America, more than 60 countries and regions.
Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:

Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.

Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.

Excavator Installation
Parameter

working voltage DC 9v-36V
working temperature -20°℃-+70°C;
storage temperature -20°℃-+70°C;
system error ≤±10%;
display error ≤±10%;
relay contact capacity AC220V 3A;
protection grade IP65(other level of protection required customized)

Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Wj

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.


Product detail pictures:

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures


Related Product Guide:

"Quality 1st, Honesty as base, Sincere company and mutual profit" is our idea, in an effort to create consistently and pursue the excellence for Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: Brazil, Bangladesh, Lithuania, Our staffs are adhering to the "Integrity-based and Interactive Development" spirit, and the tenet of "First-class Quality with Excellent Service". According to the needs of every customer, we provide customized & personalized services to help customers achieve their goals successfully. Welcome clients from home and abroad to call and inquire!
  • With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Victor Yanushkevich from Slovenia - 2017.04.28 15:45
    The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Ina from Hanover - 2017.09.28 18:29
    Write your message here and send it to us