Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, trust the first and management the advanced" for Mobile Crane Services , Mobile Crane Hire West Midlands , Mobile Crane Blocked Duties Only , Currently, we are looking forward to even greater cooperation with overseas customers based on mutual benefits. Please feel free to contact us for more details.
Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:

Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.

Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.

Parameter

working voltage DC 9v-36V
working temperature -20°℃-+70°C;
storage temperature -20°℃-+70°C;
system error ≤±10%;
display error ≤±10%;
relay contact capacity AC220V 3A;
protection grade IP65(other level of protection required customized)

Excavator Installation

 

Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Wj

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.

 


Product detail pictures:

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures


Related Product Guide:

We have been also concentrating on enhancing the things management and QC method so that we could preserve terrific edge inside the fiercely-competitive enterprise for Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: Ecuador, Lyon, Myanmar, We're your reliable partner in the international markets of our products and solutions. We focus on providing service for our clients as a key element in strengthening our long-term relationships. The continual availability of high grade solutions in combination with our excellent pre- and after-sales service ensures strong competitiveness in an increasingly globalized market. We're willing to cooperate with business friends from at home and abroad, to create a great future. Welcome to Visit our factory. Looking forward to have win-win cooperation with you.
  • In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Henry from Morocco - 2018.07.26 16:51
    The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
    5 Stars By Mavis from United Arab Emirates - 2018.06.12 16:22
    Write your message here and send it to us