Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have advanced equipment. Our products are exported to the USA, the UK and so on, enjoying a good reputation among customers for Tower Crane Safety Regulations , Ground Monitoring , Mobile Crane Driver Salary , Our goal is "blazing new ground, Passing Value", in the potential, we sincerely invite you to mature up with us and create a vivid foreseeable future jointly!
Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen Detail:

Profile
The system through the human-computer interaction interface and a variety of signal transducer, arm angle, height,working range, heavy weight and load information reflect to excavator operator, the work ability of the excavator in its design parameter range safety and efficient use/in realtime. When the excavator operation is closeto or beyond the scope of the security, the host will issue a sound and light alarm to remind the operator to stop illegal operations. If the operator is still illegal operation, the host will automatically lock the termination signal sent to dangerous operation direction of excavator arm.

Product Features
1.using the 4.3 inch TFT LCD with truecolor;
2.the hydraulic sensor adopts importedmovement with strong overload capacity;
3.using digital angle sensor;
4. using oil pressure of the poweralgorithm;
5. the main interface with a graphicaldisplay,sound and light alarm,automaticcontrol.

Parameter

working voltage DC 9v-36V
working temperature -20°℃-+70°C;
storage temperature -20°℃-+70°C;
system error ≤±10%;
display error ≤±10%;
relay contact capacity AC220V 3A;
protection grade IP65(other level of protection required customized)

Excavator Installation

 

Components
1.Angle sensor Angle sensor must fixed on the mounting plate, and the mounting plate welding on the excavator arm.
2.Pressure sensor Customers need to prepare a three-way connector for connecting our sensors, One sensor for each of the inlet and return pipes.
3.LMI monitor Come with a universal joint that can be used to secure the display to a 12- 18mm pole.
4.Interface definition dc-24v power (red:+24v ,blue: GND); buzzer; arm angle sensor; boom angle sensor; return pipes (OUT) pressure sensor; inlet pipes(IN) pressure sensor

Wj

Fault diagnosis
1. If the display does not display
Check the power supply line, Confirmation is 24v.
2. If no weight or anglesingle Check pressure sensor and line
3. If weight data Inaccurate Re-calibration NO-load data.

 


Product detail pictures:

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures

Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen detail pictures


Related Product Guide:

To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Factory directly supply Mobile Crane Method Statement - RC-WJ01 Safe Load Indicator for Excavator – Recen , The product will supply to all over the world, such as: panama, Turkey, Yemen, We taking advantage of experience workmanship, scientific administration and advanced equipment, ensure the product quality of production, we not only win the customers' faith, but also build up our brand. Today, our team is committed to innovation, and enlightenment and fusion with constant practice and outstanding wisdom and philosophy, we cater to the market demand for high-end goods, to do experienced products and solutions.
  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Gabrielle from Gambia - 2017.11.11 11:41
    We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Christian from Ottawa - 2017.09.22 11:32
    Write your message here and send it to us