2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Based on domestic market and expand overseas business" is our improvement strategy for Mobile Crane For Sale Malaysia , Mobile Crane Hire Sunshine Coast , Anti Collision Device For Cranes , "Change for the better!" is our slogan, which means "A better world is before us, so let's enjoy it!" Change for the better! Are you ready?
2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen Detail:

RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 02 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 02 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 03

Highlight
1.Visible 10 inch LCD touch screen display, show the most comprehensive working states of tower crane in operation.
2.Friendly man-machine interface; automatically generated the coordinates of Tower crane & Obstacle, and Tower crane off-line protection (Optional)
3.Strict high and low temperature test, anti-fouling and anti-corrosion.
4.Higher integration greater precision data acquisition.
5.Stable, convenient, long service life of system;
6.Video manual, Easy for installation and calibration;

Working temperature   -20℃ ~ 60℃
Working humidity   ≤95%(25℃)
Power voltage   AC220V±25%
Working mode   continuous
Overall error   ≤±5%
Repeatability error of load cell   ≤±0.3%
Non-linear error of load cell   ≤±3%

Function

Anti-collision
● Real-time monitoring Tower crane working conditions prevent collision risk of each parts, ensure the stop within functional distance setting.
● Up to 30 Tower cranes management by radio.
● Automatically generated the coordinates of Tower crane.
● Tower crane off-line protection (Optional)
The system operates in real time calculation of the distances between each crane parts and movement speed as well.
System will asthmatically control the equipped mechanism to completely stop the crane at a preset distance from certain obstacles

Zone protection
● Minimum 3 points from one obstacle to indicate a protection zone.
● Set and select activate/deactivate zones the override unit.
● Automatically generate obstacle coordinates
● Up to 10 zone around a tower crane
● Independent function distance setting

ABC_7319-2.0  ABC_7242-2.0

Data record
● Various data of Tower crane working status can be record constantly.
● Able to generate as EXCEL file and download to USB drive
● Online supervisor is available by add-on GRPS module.

ABC_7254-2.0  ABC_7314-2.0

In order to facilitate on-site construction management,the system supports working record, real-time record, anti-collision record, operation record browsing, data record,besides local browsing it supports USB download, and can be viewed on the computer as worksheet

Real-time Record  Every 5 sec continuous recording
Working Record  Record data per every lifting.
Anti-collision Record  Record every control of prevent collision.
Operating Record  Record the setting of Tower crane parameter.

 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment


Product detail pictures:

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures


Related Product Guide:

Good quality To start with,and Purchaser Supreme is our guideline to offer the top service to our customers.Presently, we've been seeking our best to be amongst the top exporters inside our industry to fulfill consumers extra need to have for 2021 High quality Crane Lifting Operation - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen , The product will supply to all over the world, such as: Luxembourg, Liverpool, Cambodia, Our mission is "Provide Goods with Reliable Quality and Reasonable Prices". We welcome customers from every corner of the world to contact us for future business relationships and achieving mutual success!
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Esther from Australia - 2017.06.29 18:55
    We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Claire from Argentina - 2018.09.08 17:09
    Write your message here and send it to us