2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Having a sound small business credit score, outstanding after-sales services and modern manufacturing facilities, we've got earned an fantastic reputation among our buyers across the globe for Mobile Crane Weight Capacity , Mobile Crane Hiring Award 2010 , Mobile Crane Hire York , Trust us and you'll gain far more. Be sure to really feel free of charge to contact us for additional details, we assure you of our best attention at all times.
2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen Detail:

RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 02 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 02 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment 03

Highlight
1.Visible 10 inch LCD touch screen display, show the most comprehensive working states of tower crane in operation.
2.Friendly man-machine interface; automatically generated the coordinates of Tower crane & Obstacle, and Tower crane off-line protection (Optional)
3.Strict high and low temperature test, anti-fouling and anti-corrosion.
4.Higher integration greater precision data acquisition.
5.Stable, convenient, long service life of system;
6.Video manual, Easy for installation and calibration;

Working temperature   -20℃ ~ 60℃
Working humidity   ≤95%(25℃)
Power voltage   AC220V±25%
Working mode   continuous
Overall error   ≤±5%
Repeatability error of load cell   ≤±0.3%
Non-linear error of load cell   ≤±3%

Function

Anti-collision
● Real-time monitoring Tower crane working conditions prevent collision risk of each parts, ensure the stop within functional distance setting.
● Up to 30 Tower cranes management by radio.
● Automatically generated the coordinates of Tower crane.
● Tower crane off-line protection (Optional)
The system operates in real time calculation of the distances between each crane parts and movement speed as well.
System will asthmatically control the equipped mechanism to completely stop the crane at a preset distance from certain obstacles

Zone protection
● Minimum 3 points from one obstacle to indicate a protection zone.
● Set and select activate/deactivate zones the override unit.
● Automatically generate obstacle coordinates
● Up to 10 zone around a tower crane
● Independent function distance setting

ABC_7319-2.0  ABC_7242-2.0

Data record
● Various data of Tower crane working status can be record constantly.
● Able to generate as EXCEL file and download to USB drive
● Online supervisor is available by add-on GRPS module.

ABC_7254-2.0  ABC_7314-2.0

In order to facilitate on-site construction management,the system supports working record, real-time record, anti-collision record, operation record browsing, data record,besides local browsing it supports USB download, and can be viewed on the computer as worksheet

Real-time Record  Every 5 sec continuous recording
Working Record  Record data per every lifting.
Anti-collision Record  Record every control of prevent collision.
Operating Record  Record the setting of Tower crane parameter.

 RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment


Product detail pictures:

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures

2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen detail pictures


Related Product Guide:

Our pursuit and enterprise goal is to "Always satisfy our customer requirements". We keep on to establish and style and design outstanding top quality goods for both our outdated and new prospects and realize a win-win prospect for our clientele likewise as us for 2021 China New Design Crane Sacety Devices And Methods - RC-A11-II Tower crane Anti-collision, Zone protection system, Load moment – Recen , The product will supply to all over the world, such as: Morocco, Angola, Philadelphia, We attained ISO9001 which provides solid foundation for our further development. Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments. It is our great honor to meet your demands. We are sincerely expecting your attention.
  • The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Claire from Uganda - 2017.03.28 12:22
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Katherine from South Korea - 2017.01.28 19:59
    Write your message here and send it to us